|
P1211594a.jpg The RICE cable, anchored in the ice with some cable played out. P1211593a.jpg The tower with the IceCube cable on the left and the RICE cable not yet pulled taut directed to the right-hand sheeve. P1211598a.jpg Feeding the RICE cable over the sheeve with the IC cable already in place. P1211599a.jpg The RICE cables are taped to the IC cable with white fiberglass tape. P1211601a.jpg The RICE cable is visible being led to the sheeve; it is identified by the white tape every 2 m or so. I'm guessing this is after the cable is deployed and the IC cable is first being fed to the SJB. P1211602a Surface Junction Box, but I don't know where the RICE quad is connected. |